Analysis and Design of Low-Voltage Power Systems: An by Ismail Kasikci

By Ismail Kasikci

You're liable for making plans and designing electricity platforms? reliable. optimistically you recognize your method via nationwide and foreign rules, defense criteria, and the entire attainable pitfalls you are going to come across. you are not definite? This quantity provide you with the wealth of expertise the writer won in two decades of perform. The enclosed CAD software program speeds up your making plans strategy and makes your ultimate layout least expensive and safe.

Show description

Read or Download Analysis and Design of Low-Voltage Power Systems: An Engineer's Field Guide PDF

Best telecommunications & sensors books

Managing Power Electronics: Vlsi and dsp-Driven Computer Systems

This booklet offers cutting-edge energy administration recommendations for contemporary digital home equipment that depend on such very large-scale integration (VLSI) chips as CPUs and DSPs. the writer completely covers all features of the sector, together with semiconductor production tactics, programs, circuits, services, and structures.

Increasing Productivity and Profit through Health and Safety: The Financial Returns from a Safe Working Environment

In all offices the healthiness and protection of staff is heavily associated with the company's profitability. Human source techniques for bettering the future health and protection of individuals within the place of work don't unavoidably fee cash - actually and so they get monetary savings. a realistic e-book in accordance with the authors' mixed consultancy event, expanding productiveness and revenue via health and wellbeing and protection exhibits readers how they could use ergonomics to generate income for his or her corporations.

Analysis and Design of Low-Voltage Power Systems: An Engineer's Field Guide

You're answerable for making plans and designing electricity structures? strong. expectantly you recognize your approach via nationwide and overseas laws, security criteria, and all of the attainable pitfalls you are going to stumble upon. you are not convinced? This quantity provide you with the wealth of expertise the writer won in two decades of perform.

Antennas for Global Navigation Satellite Systems

Content material: bankruptcy 1 basics of GNSS (pages 1–19): bankruptcy 2 basic issues for GNSS Antennas (pages 21–40): bankruptcy three satellite tv for pc GNSS Antennas (pages 41–53): bankruptcy four Terminal GNSS Antennas (pages 55–80): bankruptcy five Multimode and complex Terminal Antennas (pages 81–110): bankruptcy 6 Terminal Antennas in tricky Environments (pages 111–148): bankruptcy 7 Human person results on GNSS Antennas (pages 149–180): bankruptcy eight cellular Terminal GNSS Antennas (pages 181–206):

Extra info for Analysis and Design of Low-Voltage Power Systems: An Engineer's Field Guide

Example text

The short circuit voltage is important for the determination of ± the impedance ± the winding power loss ± the phase shift ± the short circuit current ± the arrangement of transformers in parallel Mostly uk is given as the relative short circuit voltage in percent of the primary voltage. It is a measure of the loading when a change of voltage occurs. Short circuit current: When a short circuit arises on the secondary side of a transformer during operation, the peak short circuit current ip will first flow.

4. The protective measures (TN or TT system) are known. 5. The installed total effective and reactive powers must be calculated. 6. The operating current is calculated from the total effective power. 7. The cross-section of the feeder line is calculated, considering the type of cable installation and the voltage drop. 8. The main fuse or circuit breaker is determined from the cabling selected. 9. For the calculation of short circuit currents it is necessary to determine the impedances of the individual lines and cables.

5. It is therefore possible to calculate the cross-section of the main line,the short circuit currents and the voltage drops. Case II: 1. The source impedance of the source network and the length up to the feed-in of the main distribution are known. 2. The consumer data are known and are drawn in on the planimetric map. 3. The coincidence factor is given. 4. The protective measures (TN or TT system) are known. 5. The installed total effective and reactive powers must be calculated. 6. The operating current is calculated from the total effective power.

Download PDF sample

Rated 4.60 of 5 – based on 9 votes